In KRASNOYARSK upgrade more than 1 of heat networks in the street. CONSTITUTION
Modernization of the main heating networks and a length of about 1,141 meters in the street. Constitution - one of the key projects of the investment program of OAO `Yenisei TGC (TGC-13)` for the development of heat supply facilities of Krasnoyarsk.
As a result of the project it is possible to connect the new facilities of heat consumption.
The project was implemented in two phases. In 2009 he was modernized and brought into operation area heating systems on the street. Paris Commune (from the street. Markov to the street.
Constitution) 303 meters in length with an increase in the diameter of the pipeline DN 250 mm to DN 400 mm.
In 2012, we completed the second phase of the project. As a result of this year work has been upgraded intra-site heat network length of 698 meters on the street. The Constitution.
In addition, the portion of the second stage was designed and laid an offshoot of the heat network length of 140 meters with a diameter of 250 mm for the heating of the 10th district.
Replacement of the existing pipeline sections of heat networks in larger diameter pipelines is the most effective solution to increase the capacity of thermal networks. As a result of this project is provided by
thermal transfer more resources from Krasnoyarsk CHP-2 in Central and Soviet areas of the city, and it is possible to connect the new facilities with a total heat demand load of up to 19 Gcal / h In addition, due to the replacement of heating systems improved the reliability of heat supply in these areas. And the use of high-performance thermal insulation and reinforcement of high density helps reduce heat loss and increase longevity.
Work commissioned by the Society `Yenisei TGC (TGC-13) were carried out by the contracting organization` of `` SibER.
At present, work on the modernization of inter-line second stage of the project is fully completed, finished landscaping.