PERMENERGO `DECOMMISSIONING OF 25LETNEE EQUIPMENT

`` PermEnergo the decommissioning of the 25-year-EQUIPMENT
PERMENERGO `DECOMMISSIONING OF 25LETNEE EQUIPMENT

Since the beginning of the year at transformer Perm in the January districts, Central, Paper Mill, Vladimir, South. Park, Zaozerye was replaced about two dozen power units. Those that have a low insulation resistance, poor performance of transformer oil replaced with modern, practical, do not require maintenance or quite sturdy, recently came out of the overhaul.

On average, each year in the regional center of energy perform repair of equipment 85 - 95 transformer substations and distribution points. This year, their number will increase to 97 units, which will cost a branch of IDGC of Urals `` - `` PermEnergo to 5,650,000 rubles.

The company intends to continue to actively work on programs to enhance the reliability of power supply of the capital of the Perm Territory.