At DneproGES setting a new three-phase transformers
In this case, has been replaced by phase-conductor shielded 13.8 kV, re-oil receiver, fire extinguishing system.
Along with the replacement of the transformer, the extended repair of hydraulic GA-8.
Old water cooling system transformer dismantled, which will significantly improve the environmental performance of the equipment.
Technical specifications of the new transformer allow further savings of more than 350 million kWh of electricity annually.