Tuesday, December 3, 2013

MEA NORTHWEST ALLOCATED MORE THAN MAY 1 BILLION TO REPLACE EQUIPMENT

MES North-West has provided more than 1.5 billion to replace equipment
MEA NORTHWEST ALLOCATED MORE THAN MAY 1 BILLION TO REPLACE EQUIPMENT

In 2013, during the implementation of targeted programs and repairs on power lines will be replaced with 102.6 km of ground wire, more than 2.4 million units of support rod 43 and isolation bushings, installed about 41 thousand modern glass insulators instead of old porcelain, cleared 6.8 hectares of glades. It is also planned to repair the compressor 14 with the supply of spare parts, and repair of grounding devices at 12 substations in the region.

In 2013, as part of the repair campaign specialists MES North-West will replace 7.3 million damaged insulators, repair and strengthen the foundations of 364 poles, replace the spacers 300, 245 perform power transmission towers, repair 57 ground loops.

MES North-West plan to complete all work in September 2013. These events will be sent to more than 1.5 billion rubles.